Author: danny@v8-ict.com

  • STAUT on ArchDaily

    STAUT on ArchDaily

    ArchDaily has included STAUT-Perifer’s Jan Frans Willem kindergarten and music academy on their platform. We are extremely proud that the project was selected. Link: https://www.archdaily.com/1011341/jan-frans-willems-kindergarden-and-music-academy-staut-architecten-plus-perifer?ad_source=searchad_medium=projects_tab

  • Projects tour

    Projects tour

    STAUT on projects tour. The whole team visited ongoing construction sites and projects that were completed several years ago. It was an instructive day and a pleasant reunion of satisfied builders.

  • WELL BUILDING STANDARD

    WELL BUILDING STANDARD

    STAUT participates in WELL Building Standard workshop. WELL is a building performance standard aimed at improving the health and well-being of the people who live and work in those buildings. Developed by the International WELL Building Institute (IWBI), it takes a holistic approach to optimise the impact of buildings on the health of their occupants.

  • Article ‘Architectura’

    Article ‘Architectura’

    Publication office design Amadys: https://www.architectura.be/nl/nieuws/absorberende-baffles-optimaliseren-akoestisch-comfort-in-minimalistische-kantooromgeving-staut/

  • Formwork of the platform ready

    Formwork of the platform ready

    Contractor Brebuild has finished the complex formwork for the play platform in the school Omnimundo. First day the concrete will be poured. The concrete structure will remain visible. We look forward to seeing the final result in 28 days. The final surface of the playground will increase by almost 30%.

  • Aperitivo time

    Aperitivo time

    The Italians are proud of their aperitivo for a reason. The word is derived from the Latin ‘aperire’, meaning to open. It thus refers to opening the stomach for the next meal. Our client’s fondness for Italy translates not for nothing into a cool and atmospheric bar where ‘Aperetivo’ can be enjoyed with friends.

  • MSC Belgium phase two delivered

    MSC Belgium phase two delivered

    Phase two of the office extension for MSC Belgium has been completed. Staff welfare is central to this office design. Classic office functions can be filled in flexibly according to the needs of the moment. STAUT is super happy with the positive feedback from the users.

  • Start building play platform

    Start building play platform

    Contractor Breebuild has started construction of the play platform for the Omnimundo school. The existing playground was far too small for the preschool and primary school. An additional raised play area will also serve as a canopy. This design brief for the Municipal Education Antwerp.

  • Welcome Kristina!

    Welcome Kristina!

    Kristina is a passionate architect, DIYer and project supervisor at Eindhoven University of Technology. She has a broad international background and is originally from Lithuania. Kristina studied in the Czech Republic, the Netherlands and China before finally settling down in Belgium! Within architecture, she is particularly interested in qualitative renovations, reuse, ecological building within a…

  • Renovation Grétrystraat delivered

    Renovation Grétrystraat delivered

    The conversion of a town house in Grétrystraat in Antwerp has been completed. Besides renovating the façade and redesigning a new bathroom, the kitchen was also thoroughly renovated. The building’s former glory was restored.